Friday, December 5, 2014

The shop hasn't burnt down so I guess the stove install was a SUCCESS and other news

First off,  I'll be at the Christkindl tomorrow at TJ's in Mahtowa, MN.  It's supposed to run from 10 AM til 2 PM.  That's DEC 6 2014.

It was warm enough in the shop that I couldn't see my breath with the stove and the forge going.  Only one clothing layer was needed after the hammering commenced.  The H2O quench bucket finally thawed out.  That made things a little easier e.g.
HBI MKI Bottle Opener

It starts out as a 3/16 x 1 piece of  HR flat. It's heavier duty than I expected.  I think it has possibilities for use in hand to hand combat.

No comments:

Post a Comment